Room and utility condition
Damaged bases or old connections can require additional repairs before finishing.
Specialized renovation work
Demolition, waterproofing, tiling, plumbing and finishing.

Service
Bathroom renovation depends on the correct work sequence and material systems designed for moisture. After demolition, we check bases and connections, complete waterproofing and only then begin tiling and fixture installation.
During the inspection, we discuss fixture positions, water and drainage points, electrical safety and the chosen tile format. This helps prevent incompatible solutions before work begins.
Work sequence
After inspecting the property, we agree the scope, materials and work sequence so each stage is completed at the right time.
Inspect the property and record its condition
Agree the scope, materials and estimate
Complete preparation, technical and finishing work
Check the result and hand over the completed work
Costs
An accurate price follows the inspection because it depends on the property's condition and the actual scope required.
Damaged bases or old connections can require additional repairs before finishing.
Large, small or patterned tiles require different amounts of cutting and installation time.
Moving water, drainage and electrical points increases the technical scope.

Questions
Waterproofing is essential in wet zones to protect the structure. We select a system suited to the base and expected moisture load.
It is often possible when suitable water and drainage connections and the required falls can be provided.
This depends on the curing times of adhesives, grout and sealants. We confirm the timing for the material system used.
Contacts
Tell us what service you need, where the site is and when it would be convenient to inspect it.