Base flatness
Major height differences or moving areas must be corrected before installation.
Specialized renovation work
Floor base preparation and flooring installation.

Service
The quality of new flooring depends on base flatness, stability and moisture. Before installation, we inspect the existing floor, repair loose areas and prepare the surface for the selected material.
Installation methods differ for laminate, vinyl, engineered timber and tiles. We follow product requirements and account for expansion gaps, transitions and door openings.
Work sequence
After inspecting the property, we agree the scope, materials and work sequence so each stage is completed at the right time.
Inspect the work area and check the base or connections
Agree the solution, materials and work limits
Complete the work in the correct technical sequence
Check the result and leave the work area tidy
Costs
An accurate price follows the inspection because it depends on the property's condition and the actual scope required.
Major height differences or moving areas must be corrected before installation.
Click systems, bonded materials and tiles require different preparation and installation.
Numerous corners, openings, columns and transitions increase cutting and finishing work.

Questions
Sometimes, if the old covering is stable, dry, level and compatible with the new material. We check this before work.
Moisture testing is important for mineral bases and moisture-sensitive flooring to reduce the risk of deformation.
Skirting and transitions are installed after the flooring and the main wall-finishing work are complete.
Contacts
Tell us what service you need, where the site is and when it would be convenient to inspect it.