Interior renovation

Full renovation

Major renovation with demolition, utilities, finishing and a clear work order.

  • Clear estimate after inspection
  • 2-year warranty
  • Riga, Ogre and nearby areas
Full renovation

Service

When to choose full renovation

A full renovation is required when refreshing visible surfaces is not enough and the underlying structures or utility systems also need attention. The programme can include demolition, technical work, levelling and complete final finishes.

During the inspection, we assess visible structures and finishes, clarify electrical and plumbing requirements and discuss how the rooms will be used. We then prepare an offer divided into practical work stages.

The scope can include
  • Removal of old finishes and unwanted elements
  • Renewal of electrical and plumbing systems
  • Levelling wall, ceiling and floor bases
  • Complete interior finishing
  • Quality checks and handover

Work sequence

How we organise the work

After inspecting the property, we agree the scope, materials and work sequence so each stage is completed at the right time.

1

Inspect the property and record its condition

2

Agree the scope, materials and estimate

3

Complete preparation, technical and finishing work

4

Check the result and hand over the completed work

Costs

What affects the price

An accurate price follows the inspection because it depends on the property's condition and the actual scope required.

Demolition scope

The amount of old flooring, partitions and built-in elements affects labour time and waste removal.

Utility condition

Electrical wiring, water and drainage replacement is assessed after inspecting the existing systems.

New finishes

The selected surfaces, finish standard and custom details determine the final cost.

Full renovation

Questions

Frequently asked questions about full renovation

How is a full renovation different from a cosmetic renovation?

A full renovation covers more than visible finishes: it can include demolition, base repairs and replacement of utility systems.

Is a design or technical project required?

A coordinated work plan is enough for straightforward renovation. Structural changes or complex utilities may require technical documentation.

Can the estimate be divided into stages?

Yes. We can separate demolition, utility, preparation and finishing stages so the scope and costs remain transparent.

Contacts

Request an inspection

Tell us what service you need, where the site is and when it would be convenient to inspect it.

Service area

Riga, Ogre and nearby areas